Login

Lost your password?
Don't have an account? Sign Up
https://www.constructions.club

36 comments

  1. Sanjay Malik

    Concrete is cohesive,, can understand as per flowing from flexible hose.

    Assistant near the pump hopper needs to use PPE for his safety.
    This is the biggest draw back of construction industry.

    1. Sander X

      they (electricians) will drill, cut, break concrete later for electrical instalations :). concrete flor, brick walls first, electrical later, 2 separate process, and they not calculate, combine, or plan this together

Leave a Comment

Your email address will not be published. Required fields are marked *

*
*